Meadow Mushrooms

Growing Rooms Expansion – Christchurch

360 Contractors completed the supply and installation of Chilled Water, Heating Water, Steam Pipe-work at their new Growing Room Expansion, Wilmers Road, Christchurch.

  • This project is 300 metres long.
  • Pipe-work varied from 150mm diameter – 300mm diameter
  • Fibre-glas pipe section – for Steam Pipe-work
  • Armaflex FRV 19mm – Chilled & Heating Water
  • Exterior was finished in a UV resistant paint formulation.

Processing Plant – Dunsandel

Recently we completed the supply and installation of Chilled Water, Heating Water, Steam Pipe-work at their new processing plant, Dunsandel, Canterbury.  This project was largely completed at height approximately 8.0M.

  • Pipe-work varied from 80mm diameter – 200mm diameter
  • Fibre-glas pipe section – for Steam Pipe-work
  • Armaflex FRV 19mm – Chilled & Heating Water.
  • Exterior was finished in a UV resistant paint formulation.